Provided construction administration and inspection services for an emergency infrastructure project following a major water main break that damaged critical metering equipment in Newark Street & Harrison Street in Jersey City & Hoboken, NJ
Supported the replacement of an aging underground concrete meter chamber and restoration of water metering functionality serving the City of Hoboken.
Oversaw demolition and replacement of multiple water mains (6″, 12″, 16″, and 24″), installation of new system valves, and construction of a new precast concrete metering chamber and utility building.
Managed phased, weekend-only construction operations to maintain continuous water service to Hoboken while work occurred within a major regional thoroughfare.
Coordinated construction within a flood-prone area, including inspection of elevated equipment building construction with stairs and raised floors to protect critical infrastructure.
Provided extensive traffic control coordination, including partial road closures, detour implementation, and coordination with New Jersey State Police to minimize community impacts.
Coordinated construction activities with NJ Transit, including work adjacent to rail bridges and facilities located on NJ Transit property.
Oversaw complex utility coordination, including relocation of a PSE&G utility pole and connection of new electrical service to the equipment building.
Inspected installation and startup of magnetic flow meters, pressure monitoring equipment, and RTU systems transmitting real-time data to utility operators.
Services Provided:
Construction Management and Field Oversight
Traffic Control and Staging Coordination
Utility Coordination (Water, Electric, Transit)
Inspection of Mechanical, Electrical, and Instrumentation Systems
Contractor Coordination and Schedule Management
Startup, Testing, and System Commissioning Support